Treasure Island pads, swales and canal banks
We ask Treasure Island customers which side of the site drains first, because that is where the unit belongs. Toward the western edge of Treasure Island the muck layer shows up fast, and that dictates where a driver is willing to park. Canal banks through Treasure Island are soft at the top, so units stay back from the slope where the mower has to pass.
Ground beside 79th Street Causeway in Treasure Island holds water after a heavy afternoon, so units go on the crown side of the swale. Rock trucked into Treasure Island sites makes a firm base, but the edges stay loose for longer than people expect.
Older lots in Treasure Island
Projects beside North Bay Village City Hall in Treasure Island keep the unit inside the fence so the pavement stays clear for pedestrians. A Treasure Island remodel usually takes one standard unit at the front of the drive, where the crew parks and a truck still reaches it. Tight Treasure Island lots leave little room, so a unit often sits on the apron rather than in the side yard.
Swale placements in Treasure Island need the contractor to check what the municipality allows before delivery. Condo and apartment refurbishments in Treasure Island take units at the service side of the building, away from resident parking.
Fire stations and libraries in Treasure Island
Portable classroom moves at Treasure Island campuses shift the unit two or three times across a single summer. Because Treasure Island school sites lock their gates outside work hours, service is timed to the window the contractor keeps someone there. Pavement and drop-off improvements at Treasure Island schools put the unit on the far side of the fence from the loop.
Summer break is short in Treasure Island, and every school job wants delivery the week the crews mobilise. Field and bleacher work at Treasure Island school athletic complexes takes units to the paved end of the lot.
